PERMIT 1.  *An electrical permit is required for all work performed on electrical systems INSIDE the structure.

PERMIT 2. **A SEPARATE "SAFE-TO-CONNECT" PERMIT is required on all new construction meters or any work that will require a meter to require re-connect.  For  power connection or a reconnect, please call in your inspection under the SAFE-TO-CONNECT PERMIT ONLY.  We email the approval to the power company after passing the inspection.
  
PERMIT 3. If wired, separate low voltage permits are required.

PERMIT 4.  If necessary, a separate permit and inspection are required for a T-POLE. 

Permit Fee information:
Each permit fee will be a minimum of $30.00
Pictured are the individual fees from the Electrical permit.  We hope this will help you obtain an approximate figure for the cost of your permit.
 

IMG_2132

IMG_2133

 

 



 IMG_2131
 















After you pay for the permit, please allow 24-48 hours for processing.  When processed, you will receive an email and you will be able to log in to your Sages account and see your permit. 

 

*NO VISIT TO OUR OFFICE WILL BE NECESSARY 😊

Upon clicking the link below, registering, and selecting the items that will apply to your permit, the Sages system will configure the total for you.   After you pay for the permit, please allow 24-48 hours for processing.  When processed, you will receive an email and you will be able to log in to your Sages account and see your permit. 

 
CLICK HERE TO APPLY FOR PERMIT!  
  
  

Our staff will be happy to assist you with any questions you may have regarding this new system.
Please contact our Permit Technicians or plan review staff for more information.